← Back to Blog

Ukraine's Four-Minute Missile and the Fleet in Being: What the US Could Copy, Who Builds It, What It Costs

· 23 min read An empty night harbor under a deep navy sky, with a few dark ship silhouettes far off and soft amber rings of light spreading across calm water.

In October 2026, Bogdan Maftei published an essay in The Erudite Elders on Medium titled "Ukraine's New Missile Flies for Four Minutes. Russia Pays for Years..." (member-only). His argument is that Ukraine's new FP-7 ballistic missile matters less for what it hits than for what it forces Russia to defend, and for how long. That is an old naval idea with a new launcher, and it is also, almost exactly, the argument the US Department of Defense has been making to itself about cheap, numerous weapons since 2023.

This post checks the essay's claims against primary and major sources, then asks the questions a US reader would ask next. How could the United States use the same logic? Which companies are already building toward it, and what do their contracts say about cost? And why do the established rules and the established contractors slow it down, sometimes for good reasons?

It is analysis and education only: no weapon design detail beyond what the makers publish, and nothing operational.

The short version

  • The core idea holds up. A weapon that might be fired forces the other side to spend on defense everywhere it could land. The 2024 ATACMS episode, when Russia moved most of its strike aircraft back out of range, is the best public evidence. Most of the essay's numbers check out, and the real corrections are few. The FP-7's maximum flight time on its maker's page is now 300 seconds, against the 250 seconds reported in February. The FP-9's figures have changed, and its autumn milestone was a first flight test, not the end of development. Some air defense observations credited to Fabian Hoffmann come from his own newsletter rather than the news report the essay cites.
  • The US is already buying "cheap mass." Examples include the Replicator effort (now under a Defense Autonomous Warfare Group), the 2025 drone memo that treats small drones as consumables, the Air Force's planned purchase of about 28,000 low-cost cruise missiles, and a large one-way attack drone and counter-drone push.
  • The cost gap is the whole story. A Patriot PAC-3 MSE interceptor is budgeted at about $5.3 million in fiscal 2027. A Shahed-type drone is estimated at $20,000 to $50,000, and a Ukrainian interceptor drone at $3,000 to $5,000.
  • New entrants are winning real money. Anduril, Shield AI (its Hivemind autonomy software), Castelion, Saronic, Neros, Zone 5 and others have contracts ranging from tens of millions to multibillion-dollar ceilings. The largest checks still go to incumbents: up to $24.4 billion for RTX's SM-6 and a $1 billion government stake in L3Harris's rocket-motor business.
  • The friction is real on both sides. Budget rules, test rules and two rocket-motor suppliers slow cheap mass. Those rules exist because weapons must work, explosives must not go off in a depot, and taxpayers need cost data. Several of them changed in 2025 and 2026.

What the essay argues

Maftei's piece has four moving parts.

A fleet in being. In the summer of 1690, Arthur Herbert, Earl of Torrington, commanded an outnumbered English and Dutch fleet in the Channel. He wanted to avoid a battle he expected to lose and keep the fleet intact, because an intact fleet made a French invasion too risky. Ordered to fight anyway, he lost at Beachy Head, withdrew to the Thames, and was court-martialed and acquitted. The invasion never came. His defense to Parliament, preserved in the Royal Museums Greenwich archive, is the origin of the phrase: "whilst we had a fleet in being, they would not dare make an attempt." Two years later the same fleet, under Edward Russell, won at Barfleur and La Hougue.

Four minutes versus an hour. Ukraine's long-range drones take well over an hour to reach a target 200 kilometers away. Russia has learned to use that hour to move aircraft and launchers. A ballistic missile arriving in about four minutes removes that warning time across a circle of roughly 250 kilometers.

Air defense as a budget. In Maftei's words, "It's really a budget." Every depot, airfield and headquarters inside the circle now competes for the same limited pool of long-range interceptors that also guards Moscow and the refineries. Drones drain that pool from one side, and the missile adds claims on it from the other.

Fatigue, not overload. He compares the campaign to metal fatigue, many small loads that do no visible damage until a part fails at once. On this reading, the reported shortages of Russian interceptors are the first surface cracks, and Ukraine's smart move is to build a stockpile faster than it fires.

Where it is right, and where it stretches

The strongest evidence is the 2024 ATACMS episode, and it checks out. The White House confirmed the first ATACMS deliveries in October 2023. In September 2024, National Security Council spokesman John Kirby confirmed that about 90 percent of the aircraft Russia used for glide-bomb and long-range strikes were based more than 300 kilometers from the border, beyond ATACMS reach. The Institute for the Study of War counted at least 245 Russian military objects in range, 16 of them air bases. The weapon changed behavior before it was allowed to be used against those bases. That is the fleet-in-being effect in its plainest form.

The FP-7's public specifications mostly match, with corrections. Fire Point's product page lists a range of up to 250 kilometers, a payload of up to 200 kilograms, a top speed of 1,500 meters per second and an accuracy figure of 14 meters. Earlier 2026 reports gave 200 kilometers and 150 kilograms. The essay's headline number, a 250-second maximum flight time, comes from February 2026 reporting. The maker's page now says 300 seconds, so "about four to five minutes" is the safer phrase. That report describes the launcher as mounted on a standard trailer and says the layout may also aid concealment and mobility. We found no readable source for the guidance type. The first combat use, announced by President Zelensky on October 1, 2026, is confirmed as an announcement. His office would not say what was hit, so the result is not independently verified.

The FP-9 numbers have moved. Fire Point now lists up to 850 kilometers, 800 kilograms and 2,300 meters per second, not 855 and 2,200. Its chief executive said in August that autumn was the target for a first flight, not the end of development. We found no report that it has flown.

The air defense redeployment is real, but the biggest numbers rest on one open-source study. Radio Free Europe/Radio Liberty's satellite imagery from July 2026 shows S-300 and S-400 positions emptied at Rogachevo in the Arctic and around Severodvinsk, and cites an open-source estimate that about 60 percent of those systems have left their prewar sites. The more precise count, 580 of about 927 launchers moved, comes from the same open-source study as quoted by Kyiv Post; its author is not named. President Zelensky's claim that nearly 90 launchers moved to Valdai is his claim, not independently verified. We could not confirm the essay's point about new deployments near Tula and Kaluga.

Interceptor strain is reported, not measured. CBS News quoted Ukrainian officials in June 2026 on a Russian S-300 interceptor shortage and trouble sourcing seekers and control modules. The Buk, Osa and Pantsir observations the essay credits to Fabian Hoffmann come from his own newsletter, Missile Matters, not from the CBS report, and partly from Russian military bloggers. These are signals, not an inventory.

The cheap layer is real. Ukraine's defense minister said in January 2026 that 40,000 interceptor drones would be delivered that month. That was a forecast, and the ministry later reported more than 1,500 a day. Defense News reports Zelensky's figure of $3,000 to $5,000 each, against a CSIS estimate of about $35,000 for a Shahed.

Confirmed, added context, and the few corrections.

  • Confirmed: Fire Point says its FP-1 carries about 60 percent of deep strikes. That is a company figure, and it is consistent with the essay's statement that the drone does more than half of the long-range work.
  • Confirmed: on August 1, 2026, Russia fired 27 ballistic missiles and one was shot down. Zelensky said that was "simply because there are no interceptors for the Patriot systems" (Ukrainska Pravda; UNN). NPR reported nine people killed in the city of Kyiv and more than 30 injured.
  • Added context: the Danish propellant plant is in Vojens. Its cost estimate rose from about €50 million to "above €150 million", and its opening slipped to the end of 2027.
  • Added context: the 70 ATACMS from Turkey were reported in August 2026 as a re-export needing US clearance. We found no confirmation of delivery.
  • Added context: Ukraine's anti-corruption bureau, NABU, is examining Fire Point's contracts and pricing within a wider drone procurement probe, and its ownership has been questioned (Kyiv Independent explainer, May 2026). In May 2026 a NABU letter, released by the company's co-founder, said that no founder or manager of the company had been served a notice of suspicion (UNN, May 20, 2026). A related case has charged others, and the company denies any connection to a person charged in it.
  • Corrections: the FP-7 flight time, the FP-9 figures and milestone, and the Hoffmann attribution, all described above.

Where the essay stretches. Its fatigue metaphor is vivid, but nobody outside the Russian General Staff knows how close its interceptor stocks are to failing. The scale objection also cuts harder than the essay admits. Zelensky has said Russia can make about 120 ballistic missiles a month, and Ukrainian military intelligence estimated hundreds more in stock. A fleet in being works only while the other side believes it exists in useful numbers. The fair reading is that the logic is sound, the evidence of effect is real but partial, and the predicted break in 2027 is an opinion.

The US version: cheap mass and cost imposition

The US is on the defending side of the same math. In the 2026 war with Iran, CSIS estimated that the US fired between 190 and 290 of about 400 THAAD interceptors and between 1,060 and 1,430 Patriot interceptors, a figure that does not say which Patriot variant. One of the study's authors, Mark Cancian, told the BBC, as quoted by Military Times, that money put in today would not produce a missile for three or four years. Fiscal 2027 budget documents, as reported by The War Zone, price a PAC-3 MSE at about $5.3 million and an SM-6 Block IA at about $4.3 million. A laser shot, by a Congressional Research Service estimate, costs between $1 and less than $10 at the margin, but lasers are still early in production.

So the US version of Maftei's argument has two halves: make the other side spend, and stop spending millions to stop thousands. Here is what the Pentagon (which since September 2025 also calls itself the Department of War) is already doing.

  • Replicator, renamed. Announced in August 2023 to counter China's "advantage in mass," according to the Congressional Research Service. It sought thousands of cheap autonomous systems and "an unfavorable cost-exchange ratio for the adversary." One former defense official, cited by CRS, said it had fielded only hundreds rather than thousands by its summer 2025 deadline. It now lives on in a Defense Autonomous Warfare Group, and in September 2026 the Secretary announced a four-star Autonomous Warfare Command.
  • Drones as ammunition. The July 10, 2025 memo "Unleashing U.S. Military Drone Dominance" says small drones are consumables, not durable property. It lets colonels and Navy captains buy them, and sets a goal of drones in every squad by the end of 2026. A follow-on Drone Dominance buy plans about 340,000 small drones over two years, with target prices falling from $5,000 to $2,300.
  • The Army's transformation. An April 2025 memo calls for drones and launched effects in every division by the end of 2026, and for cancelling programs it judged outdated.
  • Cheap cruise missiles. The Air Force and the Defense Innovation Unit picked four companies for an Enterprise Test Vehicle in 2024. That led to the Family of Affordable Mass Missiles, which plans about 28,000 missiles for $12.6 billion over five years. Its fiscal 2027 request is $355 million for 1,000, against about $1.5 million for an existing JASSM-ER. A related missile was approved for sale to Ukraine in August 2025: up to 3,350 Extended Range Attack Munitions for an estimated $825 million.
  • Longer-range Army fires. The Army asked for 1,134 Precision Strike Missiles in fiscal 2027 for about $1.9 billion. That is roughly $1.7 million each, by DefenseScoop's arithmetic, and part of the money depends on a reconciliation bill.
  • One-way attack drones. The LUCAS drone, used against Iran in 2026, is estimated at about $35,000 each.
  • Cheaper defense. In August 2025 the Secretary called for a new counter-drone task force, JIATF-401, which CRS describes as the department's "lead organization to develop capabilities to C-sUAS." The Army awarded its first production contract for a laser weapon in September 2026. A GAO review found Army counter-drone funding requests had grown from about $551.5 million to about $1.2 billion.
  • Golden Dome. The January 2025 executive order called for homeland missile defense including space-based interceptors. The president put the cost at $175 billion in May 2025; by May 2026, DefenseScoop reported, $185 billion had been budgeted. The Congressional Budget Office estimated a notional version at $1.2 trillion over 20 years. It is the opposite bet from cheap mass: a few very expensive layers, which is why its cost per intercept will be watched closely.

Cost imposition is also explicit in Pacific planning. In 2024 the Indo-Pacific commander, Adm. Samuel Paparo, proposed what is now called the Taiwan "hellscape" strategy: mass numbers of uncrewed systems in the strait if China invaded. That is a fleet in being built from thousands of cheap drones: its value is in making an invasion look too costly to try. We found no official US document that uses the phrase "fleet in being" for drones. The closest official language is Replicator's cost-exchange goal.

The companies and what they cost

When people list "Shield AI, Hive and Anduril" together, "Hive" most likely means Hivemind, Shield AI's autonomy software. It is the best-known "Hive" name in US defense autonomy. In February 2026 it was picked as one of two autonomy providers for the Air Force's drone wingman program, flying on Anduril's jet. By June 2026 the field had widened: DefenseScoop reported that Anduril, Shield AI and Collins Aerospace are competing to be the primary autonomy provider, with a pick due in 2027. We found no US defense company named Hive. If the German firm Helsing was meant, it is included below.

These are published contract values, ceilings or funding rounds. A ceiling is the most that can be spent, not money spent (the contract vehicles explainer covers how ceilings and task orders work). "Reported" unit costs come from news outlets, not price lists.

Scroll to compare columns and rows when the table extends beyond the box.

Company Product What it does Published cost or contract value Source Date
Anduril Company funding Defense hardware and software $5B round at a $61B valuation TechCrunch May 2026
Anduril Army enterprise contract One Army contract for its commercial products, counter-drone first Up to $20B over 10 years (ceiling) army.mil Mar 2026
Anduril Barracuda-500M Low-cost cruise missile At least 3,000 for the Army over three years; value not published Defense News May 2026
Anduril Roadrunner-M and Pulsar Reusable drone interceptor and electronic warfare About $250M Defense News Oct 2024
Anduril FQ-44A Fury Uncrewed jet that flies with fighters Production value not published; Air Force target about $30M per aircraft DefenseScoop Jun 2026
Anduril Arsenal-1 Ohio weapons factory About $1B invested (reported) Breaking Defense Mar 2026
Shield AI Company funding Autonomy software and drones $1.5B round at a $12.7B valuation TechCrunch Mar 2026
Shield AI Hivemind Software that flies aircraft without a pilot One of three competing to be primary drone wingman autonomy provider (pick due 2027); value not published Shield AI, DefenseScoop Feb and Jun 2026
Shield AI V-BAT Vertical-takeoff reconnaissance drone $198.1M Coast Guard services contract Shield AI Jul 2024
Shield AI X-BAT Vertical-takeoff autonomous combat jet About $27M per aircraft (reported company target); $150M Navy development funding Air & Space Forces, Defense One Aug and Oct 2026
Helsing HX-2 AI-enabled strike drone (Germany) 6,000 ordered by Ukraine; $1.8B round at an $18B valuation Breaking Defense, Defense News Feb 2025, Jul 2026
Castelion Blackbeard Low-cost hypersonic strike missile $200M Navy production order Defense News Sep 2026
Ursa Major Rocket motors Solid rocket motors for new Navy missiles $137M The Defense Post Oct 2026
X-Bow Systems GMLRS motor Rocket motor for Army guided rockets $13.9M joint Army investment Soldier Systems Aug 2025
Firestorm Labs xCell Drone factory in a shipping container $100M Air Force contract (ceiling) PR Newswire Jan 2025
Neros Archer Small first-person-view attack drone Up to $500M Army contract; unit cost not published TechRadar Jul 2026
Epirus Leonidas Microwave system that disables drone electronics $43.6M for two Army systems Epirus Jul 2025
Saronic Corsair Autonomous boat $392M Navy production agreement gCaptain Dec 2025
Zone 5 Rusty Dagger Low-cost long-range cruise missile $65M Navy agreement The Defense Post Aug 2026
SpektreWorks LUCAS One-way attack drone About $35,000 each (reported) Al-Monitor Mar 2026
Kratos (with Northrop Grumman) Valkyrie Jet drone wingman for the Marines $231.5M initial award to Northrop Grumman with Kratos; about $6M to $8M each (CEO, reported) Defense News, The War Zone Jan and Nov 2026
Palantir Maven Smart System Software that fuses battlefield data Ceiling nearly $1.3B through 2029 DefenseScoop May 2025
AeroVironment Switchblade Backpack-portable loitering munition $990M Army ceiling; about $53,000 flyaway cost in FY2023 budget papers (reported) AeroVironment, Shephard Aug 2024
Leidos (Dynetics) Test vehicle entry Established prime in the low-cost missile trial Not published; not carried into the next phase Breaking Defense Mar 2025
Lockheed Martin PAC-3 MSE Missile defense interceptor Seven-year deal to raise output from about 600 to 2,000 a year Lockheed Martin Jan 2026
RTX SM-6 Navy air and missile defense interceptor Up to $24.4B RTX Oct 2026
L3Harris Rocket motors One of two big US solid rocket motor makers $1B government equity stake Air & Space Forces Jan 2026

Two patterns stand out. First, the newcomers' unit prices sit far below the interceptors they would spare. Even so, most newcomer contracts are development money or ceilings, and the incumbents still hold the production-scale awards. Second, the line between "new" and "old" is blurring. Anduril now builds rocket motors and runs an enterprise contract the size of a prime's. Northrop Grumman is partnered with Kratos, and Lockheed is an investor in X-Bow. The Anduril and Shield AI profiles on this site cover their funding histories in more depth.

The friction with incumbents

None of this is a story of heroes and villains. The rules that slow cheap mass mostly exist because someone was hurt, cheated or let down without them.

Scroll to compare columns and rows when the table extends beyond the box.

Rule or interest Why it exists How it slows cheap mass What is changing
Five primes and two rocket-motor makers Scale, cleared workforce, plants that took decades to build Few bidders, shared bottlenecks; rocket motor makers fell from six to two A $1B stake in L3Harris's motor business; much smaller awards to new motor makers; the Defense Production Act's factory-investment fund is another lever, and GAO found its results were rarely measured
Budget cycle (PPBE) Fit forces to money; congressional control Planning starts more than two years ahead Portfolio acquisition executives created in the FY2026 NDAA; a commission's full replacement not adopted
Continuing resolutions Keep the government open without a budget deal No new starts or production increases; fiscal 2027 began under one, through December 11, 2026 Nothing general; GAO found DoD under a CR in all but 12 of the last 49 years
Requirements process (JCIDS) Joint validation, no duplicate programs Long staffing of documents Disestablished by an August 2025 memo
The "valley of death" Research and production are funded separately Prototypes have no production money waiting A DIU bridge program in the FY2026 NDAA; follow-on production under 10 U.S.C. 4022
Operational testing Weapons must work before full-rate production No full-rate production before testing An alternative test pathway in law; GAO warns testing-office cuts reduced oversight
Explosives safety and insensitive munitions Stop accidents in depots and ships New energetics plants need site approval and qualification No change found
Cost data (TINA) Protect taxpayers from inflated sole-source prices Commercial firms avoid government-unique accounting Threshold raised from $2M to $10M for contracts after June 30, 2026
Data rights Protect private investment; allow competitive repair Vendor lock raises costs and slows repairs GAO asked Congress to clarify manufacturing data
Other transactions Bring in nontraditional firms quickly Less cost insight; GAO rarely hears protests Use rose from $1.8B to over $18B a year; a 2025 order prefers them
District jobs Stable work for constituents Legacy lines get defended Appropriators restored funding for several planned Army cuts in January 2026 (Defense Daily, paywalled); in May 2026 lawmakers were still questioning the Army's cuts

The incumbents' case deserves a fair hearing. In 2024 the Wall Street Journal found that US startup drones in Ukraine performed poorly, and in 2025 it reported test failures at Anduril, which the company called typical of weapons development. GAO found that 18 of 40 fast-track programs started with immature technology. Boeing's fixed-price losses are the primes' warning against pushing development risk onto industry. The industry association's main ask is to end long continuing resolutions, because stable orders matter more to a factory than any rule change. And L3Harris's chief executive argues that a third rocket-motor maker would draw on the same few suppliers.

The newcomers' case is just as concrete. GAO reports that major programs now take more than 12 years to deliver. Nontraditional firms cite the cost of government-unique terms. Even the Defense Innovation Unit, built to fix this, saw 51 percent of its finished prototypes move into production. A cheap weapon that takes a decade to field is no longer cheap.

What it means for a small business

You do not need to build a missile to work in this market. Cheap mass means volume, and volume means parts, test work, software, machining, cable harnesses, energetics handling, logistics and training. These are the practical doors.

  • SBIR and STTR. The programs lapsed for about six months and were reauthorized in April 2026 through 2031. They remain the cheapest way for a small technical firm to get paid for research.
  • Other transactions. Prototype agreements under 10 U.S.C. 4022 favor nontraditional and small firms, and a successful prototype can lead to production without a new competition. Consortium membership is often the way in.
  • Subcontracting. The winners above need suppliers fast, and the incumbents are scaling up too: Northrop's rocket motor output, Lockheed's PAC-3 line. Cash timing matters as much as the award. A continuing resolution can stretch payments down the chain, as the KC-46 stopgap post shows, and the Patriot delivery-gap post covers where small suppliers fit on interceptors.
  • CMMC. Phase 1 self-assessments are in force. The third-party Phase 2 step was suspended in July 2026, but the NIST SP 800-171 controls still apply. The government contracting playbook covers the details, so they are not repeated here.
  • Certifications and free help. The SDVOSB and APEX Accelerator guide and the free small business help map show where to get free advice before you spend on consultants.

A practical caution: this market moves with budget bills. Most of the fiscal 2027 munitions surge depends on a reconciliation package, and the year started under a stopgap. Plan your capacity and borrowing as if orders can slip a year.

If you are setting up the website and storefront that a prime's buyer will check first, The $97 Launch covers that on a small budget, and the Mega Analyzer's defense-contractor readiness check shows what procurement officers look for.

Key takeaways

  • A threat that might be used imposes costs every day; a threat that is used imposes them once. That is the fleet-in-being idea, and the 2024 ATACMS episode shows it working.
  • Maftei's essay is right in its logic and mostly right in its facts. The few corrections are the FP-7 flight time, the FP-9 figures and one quote attribution, and its prediction is opinion.
  • The US is buying cheap mass now: tens of thousands of low-cost missiles planned, hundreds of thousands of small drones, and counter-drone systems priced in thousands rather than millions.
  • New entrants hold real contracts, but the biggest production checks still go to incumbents, and the two sides increasingly work together.
  • The rules that slow cheap mass protect safety, reliability and taxpayers. The 2025 and 2026 reforms loosen several of them, and how well they work is the thing to watch.

Related reading

Fact-check notes and sources

All sources were read on November 26, 2026 (UTC), between 18:45 and 19:00, and the sources added in a later review between 19:35 and 19:50. Dollar figures are tied to their date and are ceilings, requests or reported figures where marked. Where a page could not be read, we used another outlet quoting it and say so.

This post is informational analysis, not policy, investment, legal or contracting advice. It describes public reporting and public records about a war in which people are dying; nothing here endorses any strike or weapon. Mentions of companies and products are nominative fair use. No affiliation is implied.

← Back to Blog

Accessibility Options

Text Size
High Contrast
Reduce Motion
Reading Guide
Link Highlighting
Accessibility Statement

J.A. Watte is committed to ensuring digital accessibility for people with disabilities. This site conforms to WCAG 2.1 and 2.2 Level AA guidelines.

Measures Taken

  • Semantic HTML with proper heading hierarchy
  • ARIA labels and roles for interactive components
  • Color contrast ratios meeting WCAG AA (4.5:1)
  • Full keyboard navigation support
  • Skip navigation link
  • Visible focus indicators (3:1 contrast)
  • 44px minimum touch/click targets
  • Dark/light theme with system preference detection
  • Responsive design for all devices
  • Reduced motion support (CSS + toggle)
  • Text size customization (14px–20px)
  • Print stylesheet

Feedback

Contact: jwatte.com/contact

Full Accessibility Statement • Privacy Policy

Last updated: April 2026